How to correctly Install Crane

JINRUI is one of the professional overhead crane, Gantry crane manufacturers and suppliers. Don't hesitate to import customized and cheap workshop and warehouse bridge crane, EOT crane, Frame Crane made in China from our factory or check the price and design with us.


Crane is important heavy mechanical and electrical equipment tool, widely used to move horizontally or vertically, consist of lifting mechanism, running institutions, luffing and slewing mechanism and steel metal structures. These are general requirements for crane installation, as follow:


Before crane installation, fully grasp the crane performance and crane features, analyze and understand installation method and order, and strictly comply with them.


When installing, please pay attention to the wind speed, wind speed must meet the design requirements, generally not exceeding 13m/s.


All parts are connected properly and reliably.


Lifting equipment and lifting slings must be checked strictly before use.


Follow wire rope use and installation requirements, cannot be hard, cage-bending distortion, loose, broken wires, bare core unit, and so on. Special multilayer non-rotating wire rope should be packed of the rollers around directly into the drum. If necessary cut off, make sure to prevent loose.


Components must be installed in strict accordance with the design requirements, they must not cancel, substitute and add arbitrarily, any change should obtain technical personnel agreement before they execute.


After installation, must be inspected properly.


Strictly comply with the crane performance, must know clearly about manual lifting equipment, lifting capacity, parts quality, crane dimensions, lifting center of gravity height.

Before lifting, carefully inspect lifting equipment, lifting rigging. Load test should be carried out and confirmed safe.